RCI Series Menu
RCI Series Load Bank Setup Guidelines
Instructions
Installation must be done by a qualified technician.
Do not remove terminal cover before isolating power supply.
Locate the C.T in accordance with the wiring instructions. (See Wiring Diagram)
Install a voltage free contact and connect as per circuit diagram.(See Wiring Diagram)
Do not mount the SmartLoad with the control box at the top.
Do not drill holes in the control box.
Insert the load bank into the duct section or a radiator mounting adaptor.
Ensure the SmartLoad control panel area is exposed to a well ventilated area away from the radiator airflow.

Specifications and information subject to change without notice. E & OE