Load Bank Installation Details
The load bank is to be installed in a location that provides approximately 36" (1 Metre) of unobstructed clearance around all sides of the machine. This is to allow for:-
Sufficient unrestricted air flow into the intake chamber(s) in the base of the machine for necessary cooling.
Sufficient space to open the access doors at the front of the machine and to allow for resistor
replacement from the rear.
Vertical fan cooled load banks must not have any overhanging roofs or awnings which may restrict or disturb air discharge.